2007 NFL schedule delayed

theebs;1444472 said:
your going to love it man. The stadium is old and has nothing special, but the memories.

After watching all those games on tv, finally being in the building you will love it.

oh and they are not changing the opening or turkey day games, they are finalizing the primetime games for the rest of the year.

I've been a fan since 1968. I have always dreamed of going there. When I had the time, I didn't have the money. When I had the money, I didn't have the time. Now I have both.

I think the first thing I want to see however is the statue of Tom Landry. I really idolized that man when I was a kid. I think there is some kid coming out in me now just thinking about it.
 
well whenever your in town for that game, go to the stadium tour, it is ten bucks and you can see everything, suites, the landry statue (which is right out front) the locker rooms, walk down the tunnel, then you get to play catch and kick balls on the field.

Its alot of fun. I am imagining the stadium is going to have an incredible buzz this season, and then next season the buzz should just be electric with the final season.
 
theebs;1444504 said:
well whenever your in town for that game, go to the stadium tour, it is ten bucks and you can see everything, suites, the landry statue (which is right out front) the locker rooms, walk down the tunnel, then you get to play catch and kick balls on the field.

Its alot of fun. I am imagining the stadium is going to have an incredible buzz this season, and then next season the buzz should just be electric with the final season.

Yes it will, and same for the new stadium...got my season tickets...I'm ready.
 
jazzcat22;1444659 said:
Yes it will, and same for the new stadium...got my season tickets...I'm ready.


Yeah I still owe about 700 on mine. I always wait till the end of the month to pay off the balance on my season tickets.

I am very relieved they only raised my tickets 4 bucks.

I am scared to think what the seats will be in the new stadium.
 
Quote:
Originally Posted by Hostile
:dance:


__________________
HeavyHitta31;1444091 said:
Why that's funny, I'll never know, but it is :laugh2:

Is it as funny as this :trophy: :dissskin: :mchammer: :spidey:
 

Forum statistics

Threads
465,253
Messages
13,861,154
Members
23,788
Latest member
mattyice
Back
Top